Albion were employed by client to install a 80m x 20m mezzanine floor in one of their warehouses.
Albion designed and installed the floor with the client to suit their requirements.
The install was carried out over a 3 week period.
Works included:
- Erecting mezzanine structure
- Installing decking boards to newly created 1st floor
- Installing 3 nr staircases for access