Albion were employed by client to install a 80m x 20m mezzanine floor in one of their warehouses. 

Albion designed and installed the floor with the client to suit their requirements. 

The install was carried out over a 3 week period.

Works included:

  • Erecting mezzanine structure
  • Installing decking boards to newly created 1st floor
  • Installing 3 nr staircases for access