Albion recently won the tender to refurbish the 2nd and 3rd floors of the University of South Wales H Block, this meant that Albion have refurbished the whole building having refurbished the Ground and 1st floors over the past 3 years Works were carried out over a 15 week programme while the site was still active.
Works included:
Demolition and strip out works
Demountable and drylined Partitioning
New suspended ceilings throughout
40 nr new veneered doors and frames
Burmatex plank, tile and vinyl flooring
Refurbishment of toilets
Refurbishment and creation of new kitchens and breakout areas
Decoration with Crown Clean Extreme including feature wall colours to match the new Burmatex flooring
Full electrical fit out with Dextra feature lighting
Full mechanical fit out
New blinds throughout
The works are now complete for staff and students to use.