Albion were employed by Cooke and Arkwright to carry out a strip out and dilapidation works to a unit in Merthyr.

Albion were employed by the local authority to create Two Anti Bullying Toilet areas the last couple of months in two separate comprehensive schools

Albion were employed by client to install a 80m x 20m mezzanine floor in one of their warehouses. 

Albion designed and installed the floor with the client to suit their requirements. 

The install was carried out over a 3 week period.

Albion were employed by the RCT County Council to refurbish their main office in Tonypandy. 

Albion were employed to site manage to install a new roof and curtain walking to a school for the Local Authority.

Could your business benefit from another level?

‘Let Us Furnish’ in Swansea needed the floor to store more items. We discussed the project and were able to provide them with a new mezzanine installation.

Contact us today for more information on our Mezzanine flooring options.

Albion were employed by Cooke & Arkwright on behalf of their client to carry out dilapidation works and install the groundworks to install new portal frame buildings to allow more storage for the tenant.

A project that we recently completed, converting a building for a long term customer from offices to teaching areas that include kitchen tea points and new toilet and a new artificial grass area to the rear of the building.

LIGHTS, CAMERA, ACTION!!
Before Christmas we carried out an exciting project at a film studio in London!

Albion won the tender to carry out Phase 1 of the University of South Wales redevelopment of their  Newport Campus.

One of our most recently completed projects for the Local Authority to transform an old library into teaching spaces.

Customer : Brammer Buck and Hickman

Location : Newport

Albion were employed by the engineering client to create offices, toilets and kitchen/canteen for their new sales office and warehouse in Newport.

The client had recently moved into a new warehouse and needed to make a quarter of the warehouse a usable office space for staff. 

Albion won the tender to install a 9 bay demountable classroom at Cardinal Newman Comprehensive School for the local authority.

Albion were employed by the local authority to refurbish and decorate an important social building in the heart of the valleys.

Albion was employed by RCT Council to refurbish the existing ground floor level at Porth Plaza and turn it into a modern library that included offices for meetings, disabled access changing facilities, computer suite and toilets. 

A completed toilet refurbishment of a male, female and first aid room for good customer.

Albion were tasked by our client to transform a dilapidated industrial unit on their site that was used for tyre storage into a welcoming area for their drivers to use after long trips.

Albion stripped out all the existing services and installed the following:

Albion were employed by RCT Council to refurbish a 4 floor storey office block, to house 280 council staff that were moving to accommodate a new restructure. 

 Albion working alongside our sub contractors Advanced Electrical and Mechanical carried out a full electrical fit out including new lighting, power and data to each floor and a full mechanical fit out that included all new sanitary ware, 4 sets of Male, Female, disabled toilets and new kitchens to each floor and new air conditioning units.

Our latest completed project for the local authority.

Albion recently won the tender to refurbish the 2nd and 3rd floors of the University of South Wales H Block, this meant that Albion have refurbished the whole building having refurbished the Ground and 1st floors over the past 3 years Works were carried out over a 15 week programme while the site was still active.

Albion recently undertook the above project for the building owner to turn the empty existing 4th floor of the building into 15 modern serviced offices for local businesses.

A recently completed site installing the groundwork’s for 2 new units for a customer in Ammanford.

Albion were employed by a well established customer to create a new Growth Hub space at their premise to help encourage new start up companies in the area.

Albion were employed by Rhondda Cynon Taf County Council to refurbish a disused nursery in Llantrisant into a new office area for the Staying Well at Work Department which is aimed at supporting local businesses.
The Staying Well@Work programme aims to support the health and well being of staff within small and medium sized businesses in Rhondda Cynon Taf.

A recently completed site installing the groundwork’s for 2 new units for a customer in Ammanford.

Albion were employed by the local authority to complete the internal fit out of a new nursery building at Gwauncelyn Primary School in Tonteg.

Albion over the past 6 months have been employed by Hydro to bring their new plant and offices at Bedwas up to date with refurbishments of their reception, creation of a new display area and PPE office, new canteen area and male and female toilets and locker rooms.

A project coming to a completion on a primary school canteen fit out in Aberdare.

Albion were employed to install a 2nd Mezzanine floor for Gower View Foods in Llanelli to further help them increase the storage capacity in their warehouse.

Wallcolmonoy - Toilet Refurbishment Albion Workplace Solutions has completed a full toilet refurbishment for an injection moulding American company Wallcolmonoy in Pontardawe, Swansea.

The existing toilets and changing rooms were looking tired and the company wanted to provide better facilities for their staff.

Albion were employed by a new customer to install a new office area into they new warehouse.  The fit out was completed just before Christmas

Albion have recently completed a Female toilet refurbishment for a long standing customer at their premise in South Wales to add to the male refurbishment we carried out earlier in the year.

The Maltings refurbishments

Earlier in the year we reported on the refurbishments being undertaken at The Maltings in Cardiff. We are delighted to show further photos of the work after completion.

Set within an iconic Grade II listed building, the Maltings is home to a community of local businesses and individuals providing each with a tailor-made solution for their office needs.

Albion carried out a recent refurbishment of a library silent study area with individual study rooms.

Albion won the tender to carry out decoration and building works to YGG Llwyncelyn school for the RCT Council.

Albion have undertaken and completed an office refurbishment of SPC’s headquarters in Westbury after carrying out works at their South Wales branch.

The clients existing offices were tired and dated and they employed Albion to carry out a full refurbishment to bring the offices up to date and make them more functional and use friendly for their staff.

Albion were employed by a new customer to replace their existing Bakery production suspended ceiling with a new updated suspended ceilings.

Albion won the tender to carry out classroom refurbishments and Library refurbishment to the Universities Glyntaff Campus.