Albion designed and installed a new 350Sqm mezzanine floor complete with staircases, pallet gates and handrailing. Albion also installed a complete fire rated suspended ceiling including 60 minute fire rated column casing to the underside of the mezzanine to make the mezzanine fully compliant with building regulations.