Works included:

  • Demolition and strip out works
  • Demountable and drylined Partitioning
  • New suspended ceilings throughout
  • 40 nr new veneered doors and frames
  • Burmatex plank, tile and vinyl flooring
  • Refurbishment of toilets
  • Refurbishment and creation of new kitchens and breakout areas
  • Decoration with Crown Clean Extreme including feature wall colours to match the new Burmatex flooring
  • Full electrical fit out with Dextra feature lighting
  • Full mechanical fit out
  • New blinds throughout

The works are now complete for staff and students to use.