The contract consisted of works over 3 floors at the campus:

Level 1 – Refurbishing a lecture theatre and installing new lecture theatre furniture

Level 2 – Stripping out the existing kitchen area and installing individual meeting rooms

Level 3 – Creating an open plan office and teapoint

Works Included:

  • Demolition and Strip Out
  • Full M&E fit out
  • Full height and fire resistant glazed partitioning
  • New carpet and vinyl flooring throughout
  • New glass and veneered doors
  • Decoration throughout
  • Live Moss Wall installation
  • Sound Absorbent wall panels
  • Creation of teapoints
  • Theatre Furniture