The works included:

  • Installing new curtain walling to 2 teaching blocks and refurbish the internals
  • Floor marking and painting of external and internal pitches
  • Cladding of 1 teaching blocks and installing new aluminium windows and blinds
  • Creation of 2 external staircases with new handrailing
  • Installation of new security fencing and various pedestrian and vehicle gates with access controls

Works were carried out over the summer period in preparation for the new school year.