The works included:
- Installing new curtain walling to 2 teaching blocks and refurbish the internals
- Floor marking and painting of external and internal pitches
- Cladding of 1 teaching blocks and installing new aluminium windows and blinds
- Creation of 2 external staircases with new handrailing
- Installation of new security fencing and various pedestrian and vehicle gates with access controls
Works were carried out over the summer period in preparation for the new school year.